Drawing structure plans is one of the most important stages of building construction that the contractor must have complete and accurate knowledge of this stage. For building construction, the contractor must first prepare the building plan, then perform other building construction steps that include obtaining permits, estimating building construction costs, etc.

In general, the building mapping process is designed and implemented in two stages, in the first stage, the technical dimensions of the project are determined, and in the second stage of building mapping, the contractor can make an accurate estimate of the upcoming costs and time based on that. Determine project delivery. Nowadays, due to the importance of internal and external architecture of buildings, after approving the building plan, contractors request interior decoration design to the draftsman. In addition to the maximum use of the available space of the units, this has a great impact on their beauty.

The process of drawing structure maps

1. Drawing the plan of the roof and false ceiling of the building

2. Drawing an architectural map

3. Structural calculations

4. Designing a map of electrical installations

5. Designing a map of mechanical facilities